The KP Green Engineering IPO commenced on March 15, 2024, and concluded on March 19, 2024. The allotment of shares took place on March 20, 2024, and the initiation of refunds began on March 21, 2024. The shares were credited to the demat accounts of investors on March 21, 2024. Finally, the listing of KP Green Engineering on the stock exchange occurred on March 22, 2024.
The KP Green IPO was priced at ₹137 to ₹144 per share, with a lot size of 1000 shares. The total issue size was ₹189.50 crores, comprising a fresh issue of ₹189.50 crores. The IPO was listed on the BSE SME.
KP Green IPO Basic Details
Company Name | KP Green Engineering Limited |
Domain of Company | Steel Product Manufacturer |
KP Green Engineering IPO GMP Today | ₹40 |
KP Green Engineering IPO Listing Gain | 27.78% |
KP Green Engineering IPO Open Date | March 15, 2024 |
KP Green Engineering IPO Close Date | March 19, 2024 |
KP Green Engineering IPO Allotment Date | March 20, 2024 |
KP Green Engineering IPO Listing Date | March 22, 2024 |
Face Value | ₹10 per share |
Price | ₹137 to ₹144 per share |
Lot Size | 1000 Shares |
Issue Size | 13,160,000 shares of ₹5 (aggregating up to ₹189.50 Cr) |
Fresh Issue | 13,160,000 shares of ₹5 (aggregating up to ₹189.50 Cr) |
Issue Type | Book Built Issue IPO |
Listing At | BSE SME |
Company Promoters | Dr. Farukbhai Gulambhai Patel and Mr. Hassan Faruk Patel |
KP Green Engineering IPO GMP Today:
Date | GMP | Listing Gain | Kostak | Subject to |
Today | ₹40 | 27.78% | – | – |
15 March 2024 | ₹40 | 27.78% | – | – |
14 March 2024 | ₹40 | 27.78% | – | – |
KP Green IPO Details:
KP Green Engineering Limited started its journey in July 2001. We specialize in making strong steel products that are both fabricated and hot-dip galvanized. Our range includes things like Lattice Towers Structures, Substation Structures, Solar Module Mounting Structures, Cable trays, Earthing strips, and Beam Crash Barriers.
We’re proud to offer complete solutions, from fabrication to Hot Dip Galvanizing, all under one roof.
Our manufacturing hub, situated in Dabhasa, Vadodara, Gujarat, covers a whopping 200,000 sq. ft. It’s kitted out with top-notch CNC machinery and equipment.
Quality is our priority. That’s why we’ve earned ISO 9001:2015 certification. It speaks volumes about our commitment to delivering top-notch products and services, ensuring our customers are always satisfied.
As of September 30, 2023, we’re a team of 81 dedicated individuals, working hard at both our manufacturing facility and head office.
KP Green Engineering IPO More Details Click Here
KP Green Engineering IPO FAQs
When is KP Green Engineering IPO open?
KP Green Engineering IPO will open on 15 March 2024.
When is KP Green Engineering IPO Close?
KP Green Engineering IPO will be closed on 19 March 2024.
What is KP Green Engineering IPO GMP Today?
The KP Green Engineering IPO GMP aka Grey Market Premium is ₹40.
What is KP Green Engineering IPO Kostak Rates Today?
The KP Green Engineering IPO Kostak Rate is ₹000.
What is KP Green Engineering IPO Subject to Sauda Price Today?
The KP Green Engineering IPO subject to sauda rates is ₹000.
KP Green Engineering IPO Expected Returns?
The KP Green Engineering expected return is 27.78%.
How much will be the listing gain in KP Green Engineering IPO?
KP Green Engineering IPO will get listing gain of 27.78%. (Approx.)