Patel Engineering JV Bags L1 for Rs 3637.12 Cr Dibang Multipurpose Project

Patel Engineering JV Bags L1 for Rs 3637.12 Cr Dibang Multipurpose Project

Key Points of Patel Engineering Bags Multipurpose Project:

  • Patel Engineering Limited (PEL) named as L1 bidder for the Dibang Multipurpose Project by NHPC Limited.
  • The project includes the construction of head race tunnels, pressure shafts, power house, and transformer cavern.
  • The project is located in Arunachal Pradesh, India and is set to generate 2,880 MW of hydropower while aiding in flood control and water storage.
  • The project is PEL’s latest addition to their order book, which predominantly consists of projects awarded by central and state governments or other government and public sector undertakings.
  • The project is set to be executed over a period of 86 months, in a joint venture where PEL’s share is 50%.
  • Rupen Patel, the Chairman and Managing Director of PEL, highlighted that the company’s experience executing other projects in the same state would give them an advantage in delivering the project.
  • PEL’s involvement in the project is expected to contribute to the state of Arunachal Pradesh’s infrastructure while benefiting the local community and the surrounding area.

Details of Patel Engineering Bags Dibang Multipurpose Project:

Patel Engineering Emerges as L1 Bidder for NHPC’s Dibang Multipurpose Project

Patel Engineering Limited (PEL) has been named as the L1 bidder in the financial bid opening through e-reverse auction for the construction of civil works for LOT-4 of the Dibang Multipurpose Project. NHPC Limited had invited the tender for the project, which includes the construction of head race tunnels, pressure shafts, power house, and transformer cavern, among other things. The project is located in Arunachal Pradesh, India and is set to generate 2,880 MW of hydropower while aiding in flood control and water storage.

The Dibang Multipurpose Project is PEL’s latest addition to their order book, which predominantly consists of projects awarded by central and state governments or other government and public sector undertakings. The project is set to be executed over a period of 86 months, in a joint venture where PEL’s share is 50%.

Rupen Patel, the Chairman and Managing Director of Patel Engineering Limited, expressed his excitement, saying that the project is India’s largest-ever hydropower project and that PEL is thrilled to be a part of it. He also highlighted that the company’s experience executing other projects in the same state would give them an advantage in delivering the project.

PEL’s involvement in the Dibang Multipurpose Project is expected to contribute to the state of Arunachal Pradesh’s infrastructure while benefiting the local community and the surrounding area.

About Patel Engineering:

Patel Engineering is engaged in the construction of dams, bridges, tunnels, roads, piling works, industrial structures and other kinds of heavy civil engineering works in areas like hydro, irrigation & water supply, urban infrastructure and transport.

For More Latest News Click Here

Leave a Reply

Your email address will not be published. Required fields are marked *